Performance Analysis Sheet
Performance Analysis Sheet
OPERATIONS HEAD NAME: EXEPERIENCE: TIME PERIOD OF REVIEW FROM: TO: REVIEW BY NAME: POSITION: DATE OF REVIEW: REVIEW DUE DATE:
DEFINITION OF PERFORMANCE LEVEL RATINGS 1 = Overall work does not meet the minimum job standards 2 = Sometimes meets the job standards and expectations 3 = Meets the job standards and expectations 4 = Consistently exceeds job standards and expectations 5 = Far exceeds job standards and expectations To determine overall ratings, total the ratings in each section then divide by 5. Round that number to the nearest whole number based on the following scale. 1.0 to 1.5 = 1, 1.6 to 2.5 = 2, 2.6 to 3.5 = 3, 3.6 to 4.5 = 4, 4.6 to 5.0 = 5
RESOURCES MANAGEMENT
The capability to maintain sufficient resources in all Dept./branches The efficient management of manpower needs of entire Srivari Honda Ensure the maximum utilization of all the resources Ensuring the timely arrangements of resources in all Dept./Branches The capability to bring changes that may increase the efficiency
PERFORMANCE LEVEL 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
1 2 3 4 5
1 2 3 4 5
INFRA & SPACE MANAGEMENT The efficiency in maintaining Honda standards in Infra & Space The efficiency in maintaining 5s in the office Ensuring that all the resources of Srivari are being properly utilized The skill to giving suggestions on display arrangements
PERFORMANCE LEVEL 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
1 2 3 4 5
1 2 3 4 5
TARGET ACHIEVEMENT Understanding the targets and commitment towards it Special efforts to achieve the target Coordination with the Sales Head for target achievement Capacity to work under pressure based on the target Consistent achievement of sales target OVERALL PERFORMANCE COMMENTS
OVERALL RATINGS 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
TRANSFER PERFORMANCE LEVEL RATINGS FROM ABOVE MANAGING SKILLS TEAM BUILDING KNOWLEDGE LEVEL REPORTING & COORDINATION TARGET ACHIEVEMENT GENERAL
PERFORMANCE LEVEL 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
OVERALL PERFORMANCE
OVERALL PERFORMANCE RATING Instructions: Sum of above overall ratings divided by 10, then round to nearest whole number based on scale provided
1 2 3 4 5
1 2 3 4 5