I saw one non-solar project where the city inspector seemed to be friends with the electrical contractor. They spent 20 minutes shooting the breeze, then the inspector did a super-fast scan of things, signed off, and left.
May be best to watch the inspector do the inspection?
May be best to watch the inspector do the inspection?