I don't think so. However I do have a list of things I want to do, so I break them into pomodoros and I'm always surprised when I don't get close to finishing my stuff.
Because things always take longer. "Finish this feature" is scheduled at 2 pomos but in hindsight really needs 20. So then I have a choice to blow through my carefully arranged schedule and finish things, or leave work hanging. Haven't solved this one yet.